Abstract: Background: The construction industry in recent times has been characterised by time overrun which are mostly caused as a result of payment delay. The research work assessed the effect of payment delay on time performance in the construction industry with focus on the relationship between payment delay and time overrun. Materials and Methods: Data were source using case study data from 20 selected projects in Edo state with interview with key professionals on those projects. A total of 12 professionals were interviewed to identify the major causes of payment delay on the projects. Data were analysed using percentile and linear regression was used to show the relationship......
Keywords: Construction Projects; Payment Delay; performance; Time overrun and Time Performance
[1]. Aibinu, A.A and Odeyinka, H. A. (2006), Construction Delays and their Causative Factors in Nigeria, Journal of Construction Engineering and Management.1 (2).
[2]. Alaghbari, W. E., Kadir, M. R. A., Salim, A., & Ernawati, K. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206.
[3]. Ansah, S.K. (2011). Causes and Effects of Delayed Payments by Clients on Construction Projects in Ghana. Journal of Construction Project Management and Innovation. 1(1): 27 - 45, ISSN 2223-7852.
[4]. Ayodele, E.O and Alabi O.M (2011). Abandonment of Construction Projects in Nigeria: Causes and Effects. Journal of Emerging Trends in Economics and Management Sciences (JETEMS) 2 (2): 142-145. (ISSN: 2141-7024)
[5]. Djokoto, V.K.T (2017). Factors that Influence Late Payments in Government New Build Infrastructure Projects in Gauteng Province, South Africa. An Unpublished Masters Research Thesis Submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg.